Operations Quality & Lifecycle Dashboard
Last Updated: 18 September 2025, 16:30 | Eastern Province Operations Control
Overall Equipment Effectiveness
Target: 85% | Measures availability, performance, and quality.
Ore Grade vs. Plan
98.5%
Current gold grade is tracking slightly below the geological forecast of 2.1 g/t.
Cost Per Ton
$21.80
Target: $22.50 | Fuel costs and equipment uptime are driving positive variance.
Haul Truck Fleet Status
38/50
38 Operational, 5 Maintenance, 7 Standby. Click to drill down.
Haul Truck Fleet Details
Real-time status of the 50-truck autonomous haulage fleet.
Live status feed for all trucks in the fleet.
| Truck ID | Status | Location | Payload (t) |
|---|---|---|---|
| HT-04 | Operational | Haul Road 2 | 188.5 |
| HT-08 | Maintenance | Maintenance Bay | 0.0 |
| HT-12 | Standby | Crusher C-101 | 0.0 |
| HT-15 | Operational | North Face 1 | 190.1 |
Recent maintenance activities for the fleet.
-
HT-08: Low Hydraulic Pressure
Status: In Progress | Reported: 15m ago
-
HT-21: Scheduled Tire Replacement
Status: Completed | Completed: 4h ago
-
HT-02: Engine Fault Code 23A
Status: Completed | Completed: 8h ago
Pit-to-Port Production Lifecycle
Tracking material flow and quality transformation from extraction to shipment.
Mine Face
15,200 t
2.05 g/t Grade
Haulage
15,150 t
0.3% Spillage
Crusher & Mill
15,150 t
92% Recovery
Port Stockpile
4,500 oz
Ready for Shipment
Lifecycle
Value Chain Focus
Saudi Arabian gold operations
Active Alerts
Crusher C-102 Bearing Temp Critical
Bearing temperature exceeds 95°C. Risk of immediate failure. Automatic shutdown initiated.
Haul Truck HT-08 Low Hydraulic Pressure
Pressure dropped 20% below norm. Truck is rerouted to maintenance bay.
No other active alerts.
Top 5 Equipment Downtime Causes (YTD)
Identifying key drivers of lost production hours to target reliability improvements.
Mine Face Production vs. Plan (Last 24H)
Comparing actual tons extracted against the daily forecast for each active area.
Operational Analysis
Quality, Risk & Financial Intelligence
Drill into root causes, risk posture, and commercial signals sourced from pit telemetry and finance feeds.
Analysis
Production & Metallurgy
Automatic RCA on throughput, recovery, and haulage disruptions over the last shift.
Assessment
Risk Heatmap
Geotech, process, and supply chain risks plotted against severity.
Priority
Risk Watchlist
Mitigation status and owners for the top 5 risks.
Cost & Cash Drivers
Variance explanations vs. plan for OPEX, CAPEX, and cash cost.
Treasury
Finance Notes
Key financial metrics and treasury updates
-
Hedge Program
Q4 hedge rebalanced at $1,920/oz to cushion volatility.
Protected -
Sustaining Capital
Paste plant upgrade pacing 12% under draw curve.
On Track -
Working Capital
Consumable inventory trimmed to 37 days cover.
Optimized
Procurement
Critical Suppliers
Inbound consumables and contractor SLAs.
Supply Chain
Logistics Pulse
Real-time logistics and transport visibility
-
Green
Port Berth Availability
-
72%
Rail Slot Utilization
-
14 hrs
Customs Clearance Queue
Quality Intelligence
Processing & Metallurgy Insights
Deep dive into ore quality, metallurgical recovery, and laboratory compliance.
Metallurgical Recovery & QA
Recovery trend vs. QA tolerance band for milling circuits.
Lab Compliance Radar
Assay turnaround time vs. KPI thresholds for each test type.
Quality Control
Quality Assurance Bulletin
-
Watch
North Face 1 - Carbon Adsorption
Adsorption efficiency dipped 1.1% vs. target, recalibration in progress.
-
Stable
Crusher & Mill - Sampling
Auto sampler cycle adjusted to 10 mins to reduce variance.
-
On Track
Port Stockpile - Moisture
Moisture holding at 5.6% after surface cover deployment.
Lab Throughput Snapshot
Samples
482
Processed this shift
Backlog
38
Due next 2 hrs
Next Calibration
02:30
Laser particle analyzer
Fleet Performance
Autonomous Haulage Control Room
Telematics, maintenance, and dispatch KPIs for the 50-unit haulage fleet.
Fleet Utilization (Last 7D)
Daily utilization vs. 85% target threshold.
Downtime Composition
Hours lost by subsystem over the last 72 hours.
Dispatch Readiness
-
Ready
Shift A - North Ramp
10 units staged | queue 3 mins
-
Delay
Shift B - East Pit
8 units staged | queue 7 mins
-
Ready
Shift C - South Haul
6 units staged | queue 0 mins
Maintenance Timeline
-
02:10 - HT-08 Returned to Bay
Fluid sample dispatched for analysis.
-
03:40 - HT-21 Tire Replacement
Completed and returned to service.
-
04:25 - HT-02 Dynamic Testing
Engine fault cleared; monitoring for 1hr.
Asset Registry
Critical Equipment Healthboard
Plant, pit, and infrastructure assets with live health indices, work orders, and inspections.
Live Feed
Live Commentary
Operator notes streaming from pit controllers and process control.