Operations Quality & Lifecycle Dashboard

Last Updated: 18 September 2025, 16:30 | Eastern Province Operations Control

Overall Equipment Effectiveness

↑ Loading OEE trend

Target: 85% | Measures availability, performance, and quality.

Ore Grade vs. Plan

98.5%

↑ Loading ore grade trend

Current gold grade is tracking slightly below the geological forecast of 2.1 g/t.

Cost Per Ton

$21.80

↑ Loading cost trend

Target: $22.50 | Fuel costs and equipment uptime are driving positive variance.

Haul Truck Fleet Status

38/50

↑ Loading fleet readiness

38 Operational, 5 Maintenance, 7 Standby. Click to drill down.

Pit-to-Port Production Lifecycle

Tracking material flow and quality transformation from extraction to shipment.

Mine Face

15,200 t

2.05 g/t Grade

Haulage

15,150 t

0.3% Spillage

Crusher & Mill

15,150 t

92% Recovery

Port Stockpile

4,500 oz

Ready for Shipment

Lifecycle

Value Chain Focus

Saudi Arabian gold operations

Active Alerts

Crusher C-102 Bearing Temp Critical

Bearing temperature exceeds 95°C. Risk of immediate failure. Automatic shutdown initiated.

2m ago

Haul Truck HT-08 Low Hydraulic Pressure

Pressure dropped 20% below norm. Truck is rerouted to maintenance bay.

15m ago

No other active alerts.

Top 5 Equipment Downtime Causes (YTD)

Identifying key drivers of lost production hours to target reliability improvements.

Mine Face Production vs. Plan (Last 24H)

Comparing actual tons extracted against the daily forecast for each active area.